 The final project I worked on before we moved from Utah was getting the guest bathroom set for selling the house. It took a little less than 4 months from start to finish, which was just slightly longer than my 1 month estimate, but I think it came out pretty good.

Before shots of the bathroom. 

Before shot from the other side standing in the tub.

First job, strip everything out. This involved removing the plastic shower wall.

Then removing the tub and all the fixtures. Turns out the air intake for the furnace ran under the tub, so I will have to be careful with that when installing the new tub. 

Also removed the sink and toilet. The bathroom is a cube now.

A look at the floor with the vinyl flooring torn out. 

First step to putting everything back together was install the tub. This was a giant pain in the ass because of the size and placement of the tub in relation to the door. The tub was just slightly bigger than the door frame so I had to angle it in, and also remove the drywall on the far wall so it could lay flat to slide in. Eventually it was done.

Then I had to run the plumbing up from the basement. 

Before tiling, I laid down concrete floor boards so that the tiles would stick better than to the wood subflooring. I also extended the toilet drain up so it wouldn't get filled with tile mortar.

Testing out the placement of the tiles. It seems they will actually fit really well with minimal weird cut tiles. 

Installation of the tiles. Came out pretty good. I'm starting to like these larger floor tiles. 

And floor grouted and pipe cut down. 

Back to the shower. I ran all of the plumbing lines and installed the fixtures to get exact placements right. They will need to be removed to put up the concrete board and tiles but I want to make sure placement is perfect and there are no leaks before doing that. 

Removed the fittings and added concrete boards to the shower. The wife requested a shelf in the shower so I built one in. Fittings readded to make sure everything still fits and works right.

The wife wanted to add tile behind the toilet and around the sink, so the drywall was removed there and concrete board added for those. Also had to redo the plumbing for the sink. 

Finished up the concrete board around the sink.

Once the concrete board was "plastered", the vanity we purchased had a hole in the back where the plumbing attached. In order for it to not seem weird, I figured I'd paint the back of the vanity black to tie in. Seems weird of of place.

But once the vanity is installed it works well. 

Add the vanity top/ 

Start to tile around the back of the toilet and backsplash of the vanity. I don't have my tile edger yet so I'm waiting on here and will move on to the shower.

Jumping over to the tub, tiling starts off going fairly straightforward. Just getting up to the shelf level where lots more tile cutting will be needed. 

Tiles around the opening. 

And starting to tile on the side walls. At this point I needed to wait until I have the edger to finish off the side by the door frame. 

With the edger I can finish off the sink area, including tiling the right wall next to the sink.

As well as finishing off the left and back walls of the shower. 

Finished off the last wall on the right as well as put in the shelf accent tiles. 

Now is the time for the grout. The wife wanted black grout, which I've never used before. It is a pain to wash off completely. This is after the grout application. 

And after 1 complete wash.

And after the second wash.

Shower area also grouted with 2 washes.

And after the 3rd wash, it finally appears clean. The grout is also sealed to prevent the black from running in the future. 

Once tiling is done we can paint.

Tub tiles washed for the final time, sealed, and the walls painted.

And the fixtures readded back in.

Once painting is done we can start to add the main bathroom features like the toilet and sink.

Sink faucet added and plumbing hooked up.

Starting to piece the last bit of things together.

Water finally hooked back up to the sink.

A tie in from the carpet to the tile. This was eventually stained grey but I don't have a picture of the final version.

And the final shower.

And the final bath with new lights, mirror and towel bars. 

Friday, November 12, 2021

Home Remodel - Raised Veggie Beds

 Raised Veggie Beds

At the start of the pandemic lockdown in March of 2020, we decided it would be best to expand our veggie beds in order to:

1. Save money by growing some of our own food and 

2. Ensure there is food to be had. 

To do this we also needed to have raised veggie beds since the dogs have a habit of running through and ruining anything else we do. Besides just being functional, we also wanted them to look nice since they would play a pivotal function in the backyard and be easily noticeable by anyone walking by or visiting. We also didn't want to spend a ton of money. 

So this is what we came up with. I included the step-by-step instruction booklet I made for someone else who was interested in making their own based on what I did, but I can assure you, I am no expert and there are likely better methods at going about this since I did this entirely out of my own head based on what the wife had requested.

I started out with framing them to make sure that they weren't too big for the space, but also that my construction techniques would work. I ended up having to take them completely apart joint by joint because the redwood was too brittle to screw directly through and I ended up using outdoor braces similar to the ones I used on the deck construction. 

The plan was to make them weather resistant, hence the redwood, but we also didn't want toxic chemicals so we couldn't use pressure treated wood. And to make them big enough we added the metal panels so it wasn't 100% plywood. Laying them out here, we decided the letter "E" configuration would allow for the greatest access to the entire bed while still allowing maximum veggie growing space.

Slowly connecting the various sections after leveling them. The ground was slightly sloped, so although the middle and right bed approximately line up, the left bed was on an angle.

So I needed to lift it up and level out the ground. Luckily they were built sturdy enough that I could do this fairly easily.

Once the main beds were level I could connect them together. The left bed is not actually level with the other two beds but the connecting section slopes to connect them together. 

Once construction was done, it was time to add the soil. We got enough soil to fill them, however, over time the soil compacted so it only ended up half full by the end of the year.

Soil!

Once the soil was filled in we were able to fill in pea gravel around the beds. And I could also hook up the sprinkler line. The beds actually got placed right on top of a sprinkler head so I was able to remove the head and run a new sprinkler line up through the dirt so that a small sprinkler system could be installed within the beds. This would allow a constant supply of water in the rather dry Utah climate.

And from here we were able to plant several veggie plants that were all seperated out and well watered. It actually worked really well. The back of the beds had a trestle system for climbing plants like tomatoes or green beans with lights installed on top.

Flower Bed Construction Guide

The following 5 images are the pages to the construction guide I created. Just right click and save as you need.